Apex Petrochemical Complex
Emergency infrastructure
Reference inventory of egress, muster, fire protection, medical, control, ESD, ventilation, and isolation assets. Map rendering is intentionally deferred — this phase is data only.
Assembly points
Assembly Point North
North parking / administration lawn
Primary muster for A12 and C03. Wind-aware alternative is Assembly West.
Plant-wide / shared facility
Assembly Point West
West contractor parking
Primary muster for B07 and upwind alternative for sour-gas events.
Plant-wide / shared facility
Assembly Point South
South logistics yard
Primary muster for D09 and E05 loading operations.
Plant-wide / shared facility
Emergency exits
A12 North Gate Exit
North perimeter of H₂S processing block
Primary windward egress toward Assembly North when plume travels south.
Zone A12 · Hydrogen Sulfide Processing
A12 South Corridor Exit
South pipe-rack corridor
Secondary egress to West Road when north gate is blocked.
Zone A12 · Hydrogen Sulfide Processing
B07 West Stair Exit
Boiler house west stair tower
Elevated egress from boiler operating floor.
Zone B07 · Boiler & Steam Generation
B07 East Grade Exit
East grade door to utility road
Grade-level exit for maintenance crews.
Zone B07 · Boiler & Steam Generation
C03 North Rack Exit
North reactor rack walkway
Primary egress toward Assembly North.
Zone C03 · Catalytic Reactor
C03 East Road Exit
East process road
Vehicle and pedestrian exit to plant ring road.
Zone C03 · Catalytic Reactor
D09 South Bund Exit
South bund wall gate
Egress from LPG tank farm toward Assembly South.
Zone D09 · LPG Storage Tanks
D09 East Fire Road Exit
East firewater road
Secondary tank-farm egress for ERT vehicles.
Zone D09 · LPG Storage Tanks
E05 South Gate Exit
Loading bay south security gate
Primary truck-egress and pedestrian muster path.
Zone E05 · Loading & Dispatch
E05 West Pedestrian Exit
West pedestrian turnstile
Pedestrian-only exit avoiding vehicle lanes.
Zone E05 · Loading & Dispatch
Emergency shutdown stations
ESD Station A12
A12 unit edge — red mushroom cluster
Local emergency shutdown for sour-gas block and compressor C-4.
Zone A12 · Hydrogen Sulfide Processing
ESD Station C03
Reactor pad north
Trips feed, quench, and recycle on R-101 train.
Zone C03 · Catalytic Reactor
ESD Station D09
Tank farm ROV panel
Closes LPG outlet ROVs and stops loading pumps.
Zone D09 · LPG Storage Tanks
Gas isolation valves
Gas Isolation Valve IV-H2S-01
A12 inlet header
Remote-operated isolation on sour-gas feed to A12.
Zone A12 · Hydrogen Sulfide Processing
Gas Isolation Valve IV-LPG-17
T-17 outlet manifold
ROV isolation for LPG bullet T-17 toward loading.
Zone D09 · LPG Storage Tanks
Hydrants
Hydrant NH-12
North firewater ring — A12
Monitor-capable hydrant on plant firewater loop.
Zone A12 · Hydrogen Sulfide Processing
Hydrant SH-09
South firewater ring — D09
Supports tank deluge and foam induction.
Zone D09 · LPG Storage Tanks
Hydrant EH-05
Loading bay firewater spur
Covers road rack and rail spots.
Zone E05 · Loading & Dispatch
Fire extinguishers
Extinguisher Bank A12-FE
A12 control cabin exterior
Dry chemical + CO₂ wheeled units for flange fires.
Zone A12 · Hydrogen Sulfide Processing
Extinguisher Bank B07-FE
Boiler house operating floor
CO₂ for electrical / burner fronts.
Zone B07 · Boiler & Steam Generation
Extinguisher Bank D09-FE
Tank farm pump house
Dry chemical for hydrocarbon pump skids.
Zone D09 · LPG Storage Tanks
Ventilation
A12 Forced Ventilation
Knockout drum enclosure & analyzer house
Dilution ventilation interlocked with H₂S detectors.
Zone A12 · Hydrogen Sulfide Processing
B07 Boiler House Ventilation
Boiler house roof fans
Combustion air and leak dilution for steam plant.
Zone B07 · Boiler & Steam Generation
Medical room
Plant Medical Room
Administration building, ground floor east
Occupational health bay with H₂S antidote kit staging and AED.
Plant-wide / shared facility
Control room
Central Control Room
CCR — plant center, blast-resistant
24×7 operations console; SENTINEL Ops feeds displayed on wall screens.
Plant-wide / shared facility