Skip to main content

Apex Petrochemical Complex

Emergency infrastructure

Reference inventory of egress, muster, fire protection, medical, control, ESD, ventilation, and isolation assets. Map rendering is intentionally deferred — this phase is data only.

Assembly points

Assembly Point North

asm-north

North parking / administration lawn

Primary muster for A12 and C03. Wind-aware alternative is Assembly West.

Plant-wide / shared facility

Assembly Point West

asm-west

West contractor parking

Primary muster for B07 and upwind alternative for sour-gas events.

Plant-wide / shared facility

Assembly Point South

asm-south

South logistics yard

Primary muster for D09 and E05 loading operations.

Plant-wide / shared facility

Emergency exits

A12 North Gate Exit

exit-a12-n

North perimeter of H₂S processing block

Primary windward egress toward Assembly North when plume travels south.

Zone A12 · Hydrogen Sulfide Processing

A12 South Corridor Exit

exit-a12-s

South pipe-rack corridor

Secondary egress to West Road when north gate is blocked.

Zone A12 · Hydrogen Sulfide Processing

B07 West Stair Exit

exit-b07-w

Boiler house west stair tower

Elevated egress from boiler operating floor.

Zone B07 · Boiler & Steam Generation

B07 East Grade Exit

exit-b07-e

East grade door to utility road

Grade-level exit for maintenance crews.

Zone B07 · Boiler & Steam Generation

C03 North Rack Exit

exit-c03-n

North reactor rack walkway

Primary egress toward Assembly North.

Zone C03 · Catalytic Reactor

C03 East Road Exit

exit-c03-e

East process road

Vehicle and pedestrian exit to plant ring road.

Zone C03 · Catalytic Reactor

D09 South Bund Exit

exit-d09-s

South bund wall gate

Egress from LPG tank farm toward Assembly South.

Zone D09 · LPG Storage Tanks

D09 East Fire Road Exit

exit-d09-e

East firewater road

Secondary tank-farm egress for ERT vehicles.

Zone D09 · LPG Storage Tanks

E05 South Gate Exit

exit-e05-s

Loading bay south security gate

Primary truck-egress and pedestrian muster path.

Zone E05 · Loading & Dispatch

E05 West Pedestrian Exit

exit-e05-w

West pedestrian turnstile

Pedestrian-only exit avoiding vehicle lanes.

Zone E05 · Loading & Dispatch

Emergency shutdown stations

ESD Station A12

esd-a12

A12 unit edge — red mushroom cluster

Local emergency shutdown for sour-gas block and compressor C-4.

Zone A12 · Hydrogen Sulfide Processing

ESD Station C03

esd-c03

Reactor pad north

Trips feed, quench, and recycle on R-101 train.

Zone C03 · Catalytic Reactor

ESD Station D09

esd-d09

Tank farm ROV panel

Closes LPG outlet ROVs and stops loading pumps.

Zone D09 · LPG Storage Tanks

Gas isolation valves

Gas Isolation Valve IV-H2S-01

iso-h2s

A12 inlet header

Remote-operated isolation on sour-gas feed to A12.

Zone A12 · Hydrogen Sulfide Processing

Gas Isolation Valve IV-LPG-17

iso-lpg

T-17 outlet manifold

ROV isolation for LPG bullet T-17 toward loading.

Zone D09 · LPG Storage Tanks

Hydrants

Hydrant NH-12

hy-north

North firewater ring — A12

Monitor-capable hydrant on plant firewater loop.

Zone A12 · Hydrogen Sulfide Processing

Hydrant SH-09

hy-south

South firewater ring — D09

Supports tank deluge and foam induction.

Zone D09 · LPG Storage Tanks

Hydrant EH-05

hy-load

Loading bay firewater spur

Covers road rack and rail spots.

Zone E05 · Loading & Dispatch

Fire extinguishers

Extinguisher Bank A12-FE

fe-a12-1

A12 control cabin exterior

Dry chemical + CO₂ wheeled units for flange fires.

Zone A12 · Hydrogen Sulfide Processing

Extinguisher Bank B07-FE

fe-b07-1

Boiler house operating floor

CO₂ for electrical / burner fronts.

Zone B07 · Boiler & Steam Generation

Extinguisher Bank D09-FE

fe-d09-1

Tank farm pump house

Dry chemical for hydrocarbon pump skids.

Zone D09 · LPG Storage Tanks

Ventilation

A12 Forced Ventilation

vent-a12

Knockout drum enclosure & analyzer house

Dilution ventilation interlocked with H₂S detectors.

Zone A12 · Hydrogen Sulfide Processing

B07 Boiler House Ventilation

vent-b07

Boiler house roof fans

Combustion air and leak dilution for steam plant.

Zone B07 · Boiler & Steam Generation

Medical room

Plant Medical Room

med-main

Administration building, ground floor east

Occupational health bay with H₂S antidote kit staging and AED.

Plant-wide / shared facility

Control room

Central Control Room

cr-main

CCR — plant center, blast-resistant

24×7 operations console; SENTINEL Ops feeds displayed on wall screens.

Plant-wide / shared facility