Skip to main content

Apex Petrochemical Complex

Equipment catalog

Tagged industrial assets used as graph and operational context. Inspection intervals and connectivity support future maintenance and cascade reasoning.

TagTypeZoneStatusCriticalityInspectionLast PM
Reactor R-101catalytic reactorC03 · Catalytic Reactoroperational
critical
90 d2026-04-12
Compressor C-4reciprocating compressorA12 · Hydrogen Sulfide Processingoperational
critical
60 d2026-05-28
Boiler B-2steam boilerB07 · Boiler & Steam Generationoperational
high
45 d2026-06-02
Storage Tank T-17lpg bulletD09 · LPG Storage Tanksoperational
critical
180 d2026-03-18
Pipeline P-32process pipelineA12 · Hydrogen Sulfide Processingoperational
high
120 d2026-02-09
Heat Exchanger HX-8shell tube exchangerC03 · Catalytic Reactoroperational
medium
180 d2026-01-22

Reactor R-101

critical
operational

Zone C03 — Catalytic Reactor

Primary fixed-bed catalytic reactor with quench injection and effluent cooler interface. Bed TIs and DP transmitters are primary SENTINEL inputs for runaway detection.

Connected equipment

    Compressor C-4
    Heat Exchanger HX-8
    Pipeline P-32

Compressor C-4

critical
operational

Zone A12 — Hydrogen Sulfide Processing

Recycle / vapor recovery compressor serving sour-gas and LPG vapor headers. Vibration and discharge pressure trips cascade into A12 and C03 risk elevation.

Connected equipment

    Reactor R-101
    Pipeline P-32
    Storage Tank T-17

Boiler B-2

high
operational

Zone B07 — Boiler & Steam Generation

Package fire-tube / water-tube boiler supplying 42 bar(g) process steam. Flame failure, drum level, and stack opacity are key monitored states.

Connected equipment

    Heat Exchanger HX-8
    Pipeline P-32

Storage Tank T-17

critical
operational

Zone D09 — LPG Storage Tanks

Pressurized LPG bullet tank with PSV, ROV isolation, and firewater deluge. Overfill and vapor pressure are primary risk drivers for Zone D09.

Connected equipment

    Pipeline P-32
    Compressor C-4

Pipeline P-32

high
operational

Zone A12 — Hydrogen Sulfide Processing

Inter-unit hydrocarbon transfer header linking A12, B07, C03, D09, and E05. Pipe stress, flange integrity, and ROV state are monitored plant-wide.

Connected equipment

    Reactor R-101
    Compressor C-4
    Boiler B-2
    Storage Tank T-17
    Heat Exchanger HX-8

Heat Exchanger HX-8

medium
operational

Zone C03 — Catalytic Reactor

Shell-and-tube effluent / steam exchanger. Tube leaks can introduce hydrocarbon into steam condensate or elevate process temperatures downstream.

Connected equipment

    Reactor R-101
    Boiler B-2
    Pipeline P-32